The Load Bearing CompanyStructural & steel works0161 706 3593Free survey
Merseyside

Load-bearing wall removal in Formby & Crosby

Removing a load-bearing wall in Formby & Crosby? We carry the load on a correctly designed steel beam — calculations, building control, propping and installation, start to finish.

Formby, Crosby and Ainsdale are mostly 1930s and post-war detached houses, semis and bungalows, and the classic job is a wide rear opening onto a new extension or garden room, often with a goalpost frame for big sliding doors.

Removing a load-bearing wall means transferring the weight it carries — floors, walls and sometimes the roof above — onto a new steel beam that sits on padstones at each end. We handle the whole job: structural calculations, building control, temporary support, the steel installation and making good ready for plaster.

Recent wall removal work

What’s included

  • Survey and measurements for the structural engineer
  • Structural calculations and beam specification arranged — or we work to yours
  • Building Regulations application and inspections
  • Party wall guidance for semis and terraces
  • Temporary propping with adjustable props and needles
  • Steel beam supplied, lifted and installed on padstones
  • Beam packed and dry-packed tight to the structure above
  • Fire protection to building control's requirements
  • Debris removed and the opening left ready for plaster

Formby and Crosby fall under Sefton Council building control, or a registered building control approver.

Load-bearing wall removal in Formby & Crosby: your questions answered

Do you cover Formby & Crosby?

Yes — Formby & Crosby and the surrounding area are part of our regular patch. Formby and Crosby fall under Sefton Council building control, or a registered building control approver.

How long does it take to remove a load-bearing wall?

Once calculations and building control approval are in place, a typical internal wall takes one to two days to prop, remove and install the steel, plus one to two days for making good.

Can I stay in the house while a load-bearing wall is removed?

Usually, yes. The work area is sheeted off, and the house stays supported throughout because temporary props go in before any masonry is removed.

Do I need a structural engineer to remove a load-bearing wall?

Yes. Building control need calculations showing that the beam, its bearings and anything supporting them are adequate. We can arrange the engineer or work to an existing design.

How much does it cost to remove a load-bearing wall?

Most internal load-bearing wall removals with a steel beam cost roughly £1,800–£4,500 for the steel and installation, plus engineer and building control fees. Our cost guide breaks it down.

More structural work in Formby & Crosby

Wall Removal in Formby & Crosby?

Send photos or your engineer's drawings for a same-day budget price, or book a free survey in Formby & Crosby.