Load-bearing wall removal in Altrincham
Open up kitchens, dining rooms and living spaces safely, with the wall's load carried by a correctly designed steel beam.
The Load Bearing Company installs steel beams and RSJs, removes load-bearing walls and chimney breasts, and forms knock-throughs in Altrincham. Every job is designed by a structural engineer, propped, fitted and signed off by building control. A typical domestic wall removal with a steel beam costs £1,800–£4,500.
Altrincham, Hale and Bowdon have some of the busiest renovation streets in the North West — Edwardian semis and villas where the classic job is joining the kitchen and dining room into one large family space across the back of the house.
We know these houses well: high ceilings, deep floor joists, and steel that usually has to come through the house rather than over it.
Altrincham, Hale and Bowdon fall under Trafford Council building control, or a registered building control approver of your choice.
Call 0161 706 3593 or email info@theloadbearingcompany.co.uk. The Load Bearing Company, Piccadilly Business Centre, Unit C Aldo Enterprise Park, Blackett Street, Manchester M12 6AE. Free survey and a fixed price for work in Altrincham.
Open up kitchens, dining rooms and living spaces safely, with the wall's load carried by a correctly designed steel beam.
Supply and fit of steel beams, columns and goalpost frames for knock-throughs, extensions and loft conversions.
Kitchen-diners, through-lounges, new doorways and wider openings for bifold and sliding doors.
Remove chimney breasts to gain floor space, with the chimney above properly supported.
Replace cracked, rotten or sagging lintels over windows and doors, or fit new lintels to widen openings.
Shop fronts, brick facade rebuilds, wall tie replacement, subsidence repairs and repointing — with bricks and mortar matched to the original.
The smaller structural jobs that still need doing properly — joists, padstones, beam upgrades and repairs.
Loading canopies, car ports, bike sheds, smoking shelters and covered yards — galvanised frames, sheeted and guttered.
Workshops, storage units and garages — frame, cladding, roller shutters and doors, built start to finish.
Steel mezzanine floors for warehouses, units, shops and garages — designed, installed and signed off, with stairs and edge protection.
Railings, mesh and palisade fencing, security cages, gates, handrails and bollards — galvanised or powder-coated, properly fixed.
Controlled demolition and strip-out — internal walls, facades, canopies and outbuildings, safely supported and cleared.
Fit-only or supply-and-fit steel for builders, developers, kitchen fitters and loft conversion companies.
Brickwork repairs, tuckpointing, repointing and masonry work — matched to the original.
Plasterboard, drylining, plaster finishes and damproofing — interior finishing done properly.
First and second fix joinery, doors, windows, frames and carpentry — finished properly.
Real jobs, with the photos, so you can see the standard before you book a survey in Altrincham.

The entire back wall of a semi carried on one steel beam, opening the house into a new rear extension.

Several steel beams through one renovation, including twin steels tucked beneath an ornate period ceiling — cornice untouched.

Chimney breast removed to reclaim floor space, with the remaining stack above picked up on a new steel beam.
Our published price bands apply across the North West, Altrincham included. Every job gets a fixed price after a free survey.
The full breakdown is in our wall removal cost guide and steel beam installation cost guide.
Most domestic jobs in Altrincham cost £1,800–£4,500 for the steel beam and installation, plus £350–£1,000 for the structural engineer's calculations and £300–£1,000 for building control. A full-width rear opening with a goalpost frame is usually £5,000–£10,000.
The installation itself typically takes one to two days for a single beam. From survey to sign-off, including calculations and building control, it usually runs three to six weeks, longer if party wall notice is needed.
Yes. Removing a load-bearing wall or chimney breast needs Building Regulations approval and an engineer's calculations. Altrincham, Hale and Bowdon fall under Trafford Council building control, or a registered building control approver of your choice.
Yes. We remove chimney breasts across Altrincham with the stack above properly supported. A single ground-floor chimney breast typically takes two to four days including the support and making good.
Send a couple of photos and rough sizes — we'll come back the same working day with honest advice and a budget price.