Chimney breast removal with the stack carried on steel
Chimney breast removed to reclaim floor space, with the remaining stack above picked up on a new steel beam.


Where a chimney breast comes out but the stack above stays, that masonry has to be properly carried. We designed and installed the steel support, took out the breast, and packed the steel tight to the remaining chimney — reclaiming the floor space without touching the stack above the ceiling.
What the job involved
- Chimney breast removed and the stack above supported on new steel
- Engineer's calculations for the remaining masonry
- Steel beam installed, packed and pinned tight to the stack
- Opening made good ready for decoration
References for this job are available on request. The Load Bearing Company is reviewed on Google; every review there is from a real customer.
Services used: chimney breast removal, steel beam & rsj installation.
More projects
Full-width rear opening for a house extension
The entire back wall of a semi carried on one steel beam, opening the house into a new rear extension.
See the project →Whole-house structural package in a period property
Several steel beams through one renovation, including twin steels tucked beneath an ornate period ceiling — cornice untouched.
See the project →New-build three-bay steel storage units
New-build steel-framed storage units on a brick plinth, with galvanised roller shutters and personnel doors, built to handover.
See the project →