Knocking through in a stone cottage or terrace in Marple, Romiley or Mellor
How is a stone wall built, and why does it matter?
Older stone houses around Marple, Romiley, Compstall and Mellor were mostly built with solid stone walls. Many internal and party walls are two faces of stone with smaller stone and mortar packed between them, rather than bonded brick.
When you cut an opening, that core can be loose. The work goes more slowly than in brick, and the ends of the opening are rebuilt or consolidated so the beam sits on something solid.
What does the beam sit on in a stone wall?
Not straight onto the rubble. Each end of the opening is cut back to sound masonry and the beam bears on a padstone, usually concrete, bedded to spread the load across the stone below. The engineer sets the padstone size from the load and the strength of the wall.
Where the stone at one end is poor, the answer may be a steel post down to a new foundation instead.
Why does propping take longer in stone?
Needles go through holes cut in the wall above the opening, and in a thick stone wall those holes are deeper and the stone is less predictable than brick. The wall above has to be held without stones dropping out of the core.
So the propping is planned around what the wall turns out to be once the first hole is opened. Allow a little more time on site than for a brick semi.
What about low ceilings and old timber beams?
Cottage ceilings are often low, and some have exposed timber beams or a timber lintel over the old fireplace. A steel below a low ceiling can leave very little headroom.
The engineer can look at options such as a deeper, narrower section, a beam set higher into the wall above, or keeping a short length of wall. Some owners clad the new steel in timber to suit the room. The steel still needs proper fire protection.
Does a conservation area affect it?
Stockport Council says there are currently 37 conservation areas in the borough, with extra planning controls over demolition, minor developments and trees, and Article 4 Directions in some. These are about the outside of buildings, so they rarely affect an internal knock-through.
They do matter if you are making a new opening in an outside wall. If the cottage is listed, internal work that affects its character needs listed building consent as well.
Is damp a problem when the wall comes out?
It can be. Solid stone walls with no cavity can hold moisture, and the bottom of an internal wall may be damp. When the wall is removed, the floor and wall junctions are made good with materials that suit the wall, rather than sealing damp in with cement.
Who approves the work?
Marple, Romiley and Mellor are in the Stockport borough, so you can apply to Stockport Council building control or a registered building control approver. The council's website has a tool to check whether your work needs building regulations. Removing a load-bearing wall does, as a material alteration under regulation 3 of the Building Regulations 2010.
What does it cost?
Our published range for a typical opening is £1,800–£4,500 for the steel and installation, plus £350–£1,000 for the engineer and £300–£1,000 for building control. Thick stone walls and slower propping usually put a cottage towards the upper end, so we price after seeing the wall.
Related questions
Can you match the stone where the wall is cut?
Where stone is exposed, the ends of the opening can be finished in reclaimed stone from the wall itself. More often the reveals are plastered to match the rest of the room.
Is a party wall notice needed in a stone terrace?
If the beam bears on the wall shared with next door, yes. Cutting into a party structure needs a notice under the Party Wall etc. Act 1996 at least two months before the work starts.
Will the dust be worse than in a brick house?
Cutting stone is dusty, and lime mortar and rubble cores add to it. The work area is sheeted off, extraction is used on cutting tools and the site is cleaned at the end of each day.
Ready to take it further? See our knock-throughs & new openings service.