Turning a back window into French or sliding doors in an Urmston semi
Is it a big structural job?
Not if the doors are the same width as the window. The brickwork below the window sill carries little more than itself, so cutting it out to floor level usually leaves the lintel above doing the same job as before.
The structural work grows when the opening gets wider. Then the wall either side is shortened, the lintel is too short, and something new has to carry the wall, the floor and sometimes the roof above.
What does a wider opening need?
A new lintel or steel beam designed for the load, bearing far enough into the wall at each end. On the back wall of a semi that is usually the first-floor joists and the bedroom wall above, and on some houses part of the roof.
Openings across most of the back wall may need a goalpost frame, with posts down to pad foundations, because the remaining nibs of brickwork are too short to carry the beam.
What changes in a cavity wall?
Most 1930s and later semis in Urmston and Flixton have cavity walls, so both leaves are supported and the opening is detailed to keep water out. That means a lintel or beam that picks up both leaves, a cavity tray over the head where needed, closers at the sides, and a damp-proof course at the threshold.
Edwardian houses with solid walls need a different head detail. The engineer and installer check which you have before ordering anything.
What approvals do I need?
Two things can need building regulations approval here. Widening the opening affects the structure, which makes it a material alteration under regulation 3 of the Building Regulations 2010. Separately, GOV.UK lists replacing windows and doors as work that may need approval.
For the doors, GOV.UK says you do not need to get approval yourself if you use someone registered with a competent person scheme. The structural opening still goes to building control.
Who approves the work in Urmston?
Urmston, Flixton and Davyhulme are in Trafford. You can apply to Trafford Council building control through its Submit-a-Plan portal, as a full plans or building notice application, or use a registered building control approver.
Building control inspect the new lintel or steel and its bearings before the opening is closed up and plastered.
Does it need planning permission?
It changes the outside of the house, so check before you order the doors. The answer depends on the house. If it is listed, in a conservation area, or its permitted development rights have been removed, ask Trafford's planning team first.
What does it cost?
Cutting down to floor level at the same width is a small job, and we price it after seeing the wall. A widened opening on a single steel sits within our published £1,800–£4,500 range, plus £350–£1,000 for the engineer and £300–£1,000 for building control. A full-width opening with a goalpost frame is typically £5,000–£10,000.
Related questions
Can the old lintel stay if I widen the opening slightly?
Usually not. A lintel needs to bear far enough into the wall at each end, so even a small widening can leave it short. The engineer decides whether it can stay or needs replacing.
Is there a radiator under the window?
Often, yes. It has to be moved before the wall is cut down, so plan where the heat will come from once the doors are in.
Who should go first, the door fitter or the structural work?
The structural work. The opening is formed, the lintel or steel installed and inspected, and then the door fitter measures the finished opening for the frame.