Opening the back of a Wilmslow house into a new extension: steel, goalposts and sign-off
Why is the old back wall such a big job?
It carries more than most internal walls. The rear wall of a house holds up the floor joists, the wall above and usually part of the roof. In a cavity-walled house it is also two walls tied together, and the new steel has to pick up both leaves.
When the extension is built, that wall becomes internal. The opening is what turns the extension into one room with the house.
When do you need a goalpost frame?
When the masonry left at the ends of the opening can't carry the beam on its own. That is common in Wilmslow, where wide sliders and bifolds across most of the back of the house are popular.
A goalpost frame adds a steel post at each end, bolted to the beam and standing on a pad foundation, so the load goes straight to the ground rather than into short nibs of brickwork.
How does the steel fit around the extension build?
The order matters, and the steel installer and the extension builder need to agree it:
- Extension foundations, including any pads for goalpost posts, go in first
- The extension walls and roof are built up against the existing house, weathertight
- The old wall is propped, cut out and the steel installed, with a cavity tray where the roofs meet
- Building control inspect the steel and bearings before it is boxed in and fire protected
- Making good, the floor joint and the kitchen follow
Can the opening go in before the extension is built?
Sometimes, but it leaves the house open to the weather. Most jobs keep the old wall in place until the extension roof is on, then form the opening quickly. If the steel has to go in early, the opening is temporarily boarded and sealed.
Who approves it in Wilmslow?
Wilmslow, Handforth and Alderley Edge are in Cheshire East. You can use Cheshire East Council building control or a registered building control approver, usually one application covering the extension and the opening.
Cheshire East offers next-day inspections if you book by 3:30pm the working day before, and asks you to tell it within 5 days when work is complete so it can arrange the final visit and issue the completion certificate.
Does my neighbour need a party wall notice?
If the house is semi-detached and the beam or a post bears on the party wall, yes. Extension foundations close to a neighbour's can also need notice under the Party Wall etc. Act 1996. Notice for work to a party structure must be served at least two months before it starts.
What does it cost?
A full-width rear opening for bifold or sliding doors, with a goalpost frame, pad foundations and longer steels, is typically £5,000–£10,000 on our published figures. A narrower opening on a single beam can sit within the £1,800–£4,500 range. Add £350–£1,000 for the engineer if it is not already in the extension design.
Related questions
Can the beam be hidden in the ceiling?
Sometimes, by setting it up into the floor zone with the joists hung off it, or by matching the extension ceiling height to the underside of the steel. Decide early, because it changes the design.
Should the extension builder or a specialist fit the steel?
Either can, as long as they work to the engineer's design. Many extension builders bring in a structural specialist for the opening because the propping and lifting are the riskiest part of the job.
Can the posts be hidden?
Usually they are built into the new wall or boxed in at the ends of the opening, so the finished room shows only a clean frame around the doors.
Ready to take it further? See our steel beam & rsj installation service.